Street Department

The Street Department’s mission is to provide high quality service to the citizens of Garland by maintaining, repairing and replacing streets, alleys, and other related infrastructure. A safe road system is provided through proper maintenance, rehabilitation, and replacement of deteriorated segments of pavement and other related infrastructure. We uphold the highest regard for customer satisfaction.

The Street Department provides the following services: 

  • Pothole repair
  • Major street patching, milling, and grinding
  • Level lifting of the pavement to eliminate standing water
  • Alley grading
  • Crack sealing
  • Fallen tree removal
  • Shoulder maintenance
  • Street sweeping
  • Guard rail repair
  • Severe weather response – snow/ice street sanding and high water barricading
  • Concrete alley/street repair
  • Concrete alley/street reconstruction
  • Asphalt street rehabilitation

To view the current City Construction Projects, Click Here.

To view the Street Departments FY 2010-2013 Infrastructure Construction Status Map, Click Here.

To view the Street Departments proposed FY 2014-2016 Infrastructure Construction Status Map, Click Here.


The Street Department may be contacted by calling 972-205-3555 or via email. The office is located at 1775 Gasoline Alley. Office hours are 7:00 a.m. - 5:00 p.m., Monday through Friday, excluding holidays. To report an emergency at any other time, contact the Water Department dispatcher at 972-205-3210.

The Street Department also maintains a Concrete Recycling Center, located at 3637 Castle Drive, where concrete pavement is crushed to make base material for street construction projects. Persons who reside within the City of Garland and contractors performing work for the City of Garland may dump concrete rubble at the concrete recycling center free of charge. If you have any questions concerning the concrete recycling center, call (972) 205-3555.